Here are some video clips of the construction of a Zero Energy Home in Killingworth Connecticut. Feel free to visit their website at http://www.zeroenergyhomesct.com/.
- Septic Installation
- Setting the septic tank into the fields 1250 gallons delivered to the site and placed in the hole under contract. Slow but sure because it has to go in perfect.
- Assisting in raising a wall frame.
- Digging the well.
- Assisting in raising the second floor exterior wall.